Construction@Countway

Time-lapse cameras are back and the
renovation is moving fast!
We are looking forward to the day we
can show you in person.

 
 September 14 - September 18
Thank you for subscribing! If this is your first newsletter head to the Countway Renovation webpage for time lapse videos or click on this link to read past issues.

On the INSIDE

  • 2nd Floor:
    • New toilet room work
  • 1st Floor
    • Installation of new mechanical/electrical/plumbing systems
    • Tape/paint of drywall perimeter soffits 
    • New plumbing work
    • New walls metal framing work
    • Terrazzo floor installation
    • New ACT ceiling work
  • L1 Floor
    • Glass doors and interior storefronts
    • New lighting at circulation area
    • Cafe plumbing work
    • Bathroom plumbing work

On the OUTSIDE

  • Travel Route Changes
    • Lower lever plaza closed at Huntington Avenue
    • Lower level plaza at Shattuck always accessed from temporary stairway
    • Stone stairs at Shattuck closed for renovation work
    • Stairs at Kresge always open
    • New temporary access bridge from Countway parking lot to building (New Bookdrop Location)
    • Shattuck Street entrance modifications
  • Site work and soil removal
  • Form work for new ramps and stairs
  • Generator upgrade work
  • Installation of temporary generator
  • Miscellaneous demo of concrete around site
  • Removal of marble balustrade - west side
New Bookdrop Location - South side of building;
Back of Countway Parking Lot (713 Huntington Avenue)

Construction Contacts

Questions about construction?

  • Fred Hagerty: fred_hagerty@hms.harvard.edu
Follow @CountwayConstruction on Instagram for more updated pictures and videos!
Facebook
Twitter
Instagram
Renovation Website
Copyright © 2020 Countway Library, All rights reserved.


Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.

Email Marketing Powered by Mailchimp